参考文献/References:
[1] 杨成. 列车操纵控制辅助系统[J]. 机车电传动,2017(1):55-60.
[2] MILROY I. Aspect of automatic train control[D].London: Loughborough University, 1980.
[3] LEE G, MILROY I, TYLER A. Application of pontryagin’s maximum principle to the semi-automatic control of rail vehicles[C]//
Second Conference on Control Engineering. Newcastle, 1982: 233-236.
[4] 梁志成. 货运列车辅助驾驶算法仿真研究[D]. 成都:西南交通大学, 2015.
[5] ZHANG L, ZHUAN X. Development of an Optimal Operation Approach in the MPC Framework for Heavy-Haul Trains[J].IEEE Transactions on Intelligent Transportation Systems, 2015,16(3):1391-1400.
[6] 王新培. 基于多目标的重载列车优化操纵研究[D]. 成都:西南交通大学, 2016.
[7] 葛学超. 基于专家系统的货运列车优化操纵算法研究[D]. 成都:西南交通大学,2017.
[8] HUANG Y, TAN L, CHEN L , et al. A neural network driving curve generation method for the heavy-haul train[J]. Advances in Mechanical Engineering, 2016, 8(5):1-14.
[9] 王悉. 基于机器学习的重载列车智能驾驶方法研究[D]. 北京:北京交通大学,2017.
[10] CLEVERT D-A, UNTERTHINER T, HOCHREITER S. Fast and Accurate Deep Network Learning by Exponential Linear Units (ELUs)[C/OL]//ICLR 2016. San Juan, Puerto Rico, 2016. https://arxiv.org/abs/1511.07289v5.
[11] KINGMA D P, BA J. Adam: A Method for Stochastic Optimization[J/OL]//ICLR 2015. San Diego, CA, 2015. https://arxiv.org/abs/1412.6980v9.
相似文献/References:
[1]冯江华,胡 惇,罗凌波. 交直交中压大功率变频技术在冶金轧机上的应用[J].控制与信息技术(原大功率变流技术),2015,(05):1.[doi:10.13889/j.issn.2095-3631.2015.05.001]
FENG Jianghua,HU Dun,LUO Lingbo. Application of AC-DC-AC High -power Medium-voltage Converter on Metallurgical Mill[J].High Power Converter Technology,2015,(03):1.[doi:10.13889/j.issn.2095-3631.2015.05.001]
[2]张 明. 现代电力电子集成技术综述[J].控制与信息技术(原大功率变流技术),2016,(01):1.[doi:10.13889/j.issn.2095-3631.2016.01.001]
ZHANG Ming. Overview of Modern Power Electronics Integration Technology[J].High Power Converter Technology,2016,(03):1.[doi:10.13889/j.issn.2095-3631.2016.01.001]
[3]窦泽春,刘国友,陈 俊,等. 大功率压接式IGBT 器件设计与关键技术[J].控制与信息技术(原大功率变流技术),2016,(02):21.[doi:10.13889/j.issn.2095-3631.2016.02.005]
DOU Zechun,LIU Guoyou,CHEN Jun,et al. Design and Key Technologies of High-power Press-pack IGBT Device[J].High Power Converter Technology,2016,(03):21.[doi:10.13889/j.issn.2095-3631.2016.02.005]
[4]熊 辉,袁 勇,黄 南,等. 风电功率组件电热特性分析[J].控制与信息技术(原大功率变流技术),2016,(02):47.[doi:10.13889/j.issn.2095-3631.2016.02.010]
XIONG Hui,YUAN Yong,HUANG Nan,et al. Analysis of Electrical & Thermal Performances for Power Assembly of Wind Power[J].High Power Converter Technology,2016,(03):47.[doi:10.13889/j.issn.2095-3631.2016.02.010]
[5]邓云川,高 宏,陈建君. 基于拓展Carson 理论的单线隧道内牵引网电气参数计算研究[J].控制与信息技术(原大功率变流技术),2016,(03):1.[doi:10.13889/j.issn.2095-3631.2016.03.100]
DENG Yunchuan,GAO Hong,CHEN Jianjun. Study of Electrical Parameter Calculation for Traction Network in Single-line Tunnel Based on the Extend of Carson Theory[J].High Power Converter Technology,2016,(03):1.[doi:10.13889/j.issn.2095-3631.2016.03.100]
[6]章志兵,张志学,陈志博. 交流传动列车谐波性能优化策略[J].控制与信息技术(原大功率变流技术),2016,(04):0.[doi:10.13889/j.issn.2095-3631.2016.04.001]
ZHANG Zhibing,ZHANG Zhixue,CHEN Zhibo. Optimization of the Harmonic in AC Drive Locomotive and EMUs[J].High Power Converter Technology,2016,(03):0.[doi:10.13889/j.issn.2095-3631.2016.04.001]
[7]王 俊,张 渊,李宗鉴,等. SiC GTO 晶闸管技术现状及发展[J].控制与信息技术(原大功率变流技术),2016,(05):7.[doi:10.13889/j.issn.2095-3631.2016.05.100]
WANG Jun,ZHANG Yuan,LI Zongjian,et al. Technology Status and Development of SiC GTO Thyristor[J].High Power Converter Technology,2016,(03):7.[doi:10.13889/j.issn.2095-3631.2016.05.100]
[8]彭朝阳,白 云,申华军,等. 3 300 V 高压4H-SiC 结势垒肖特基二极管器件的研制[J].控制与信息技术(原大功率变流技术),2016,(05):46.[doi:10.13889/j.issn.2095-3631.2016.05.200]
PENG Zhaoyang,BAI Yun,SHEN Huajun,et al. Development of High voltage 4H-SiC Junction Barrier Schottky Diode with 3 300 V Blocking Voltage[J].High Power Converter Technology,2016,(03):46.[doi:10.13889/j.issn.2095-3631.2016.05.200]
[9]臧晓笛,田德文. 低开关频率下永磁同步电机弱磁区电流谐波抑制[J].控制与信息技术(原大功率变流技术),2016,(06):1.[doi:10.13889/j.issn.2095-3631.2016.06.200]
ZANG Xiaodi,TIAN Dewen. Current Harmonic Suppression of Permanent Magnet Synchronous Motor in Weak Magnetic Field under Low Switching Frequency[J].High Power Converter Technology,2016,(03):1.[doi:10.13889/j.issn.2095-3631.2016.06.200]
[10]李彦涌,忻 力,赖 伟,等.基于现场数据的IGBT 结温实时计算[J].控制与信息技术(原大功率变流技术),2017,(01):24.[doi:10.13889/j.issn.2095-3631.2017.01.005]
LI Yanyong,XIN Li,LAI Wei,et al.IGBT Real-time Junction Temperature Calculation Based on Converter Operation Data[J].High Power Converter Technology,2017,(03):24.[doi:10.13889/j.issn.2095-3631.2017.01.005]