[1]胡书举,孟岩峰,宋 斌,等.大型风电机组传动链测试系统国内外现状及展望[J].控制与信息技术(原大功率变流技术),2017,(06):10-14.[doi:10.13889/j.issn.2095-3631.2017.06.002]
 HU Shuju,MENG Yanfeng,SONG Bin,et al.Current Situation and Prospect of Large-scale Wind Turbine Drive-train Test System at Home and Abroad[J].High Power Converter Technology,2017,(06):10-14.[doi:10.13889/j.issn.2095-3631.2017.06.002]
点击复制

大型风电机组传动链测试系统国内外现状及展望()
分享到:

《控制与信息技术》(原《大功率变流技术》)[ISSN:2095-3631/CN:43-1486/U]

卷:
期数:
2017年06期
页码:
10-14
栏目:
综述·评论
出版日期:
2017-12-05

文章信息/Info

Title:
Current Situation and Prospect of Large-scale Wind Turbine Drive-train Test System at Home and Abroad
文章编号:
2095-3631(2017)06-0010-05
作者:
胡书举孟岩峰宋 斌马 蕊李丰林邓 雅
(中国科学院电工研究所,北京 100190)
Author(s):
HU Shuju MENG Yanfeng SONG Bin MA Rui LI Fenglin DENG Ya
(Institute of Electrical Engineering, Chinese Academy of Sciences, Beijing 100190, China)
关键词:
大型风电机组传动链地面测试系统风力机模拟非扭矩载荷模拟电网模拟海上风电
Keywords:
large-scale wind turbine drive-train ground testing system wind turbine simulation non-torque load simulation grid simulation offshore wind power
分类号:
TM315
DOI:
10.13889/j.issn.2095-3631.2017.06.002
文献标志码:
A
摘要:
大型风电机组传动链地面试验测试是加快风电技术研发进程、确保风电设备性能与可靠性的重要手段,国际上风电技术发达的国家近年来非常重视传动链地面公共测试系统的建设,而国内目前尚无类似的公共测试系统。文章首先对美国、丹麦、德国等国家大功率风电机组传动链地面公共测试系统的情况进行了总结,介绍了其测试平台可实现的功能,并从平台建设、试验测试能力、运行管理等方面分析了这些平台的共性之处;接着从平台建设、国家政策等方面说明了国内传动链地面测试系统情况,介绍了相关规划和已经开展的研究布局;最后对我国大型风电机组公共传动链地面测试系统的未来进行了展望,并从我国风电技术和产业的发展需求出发,对系统的研制和建设提出了建议。
Abstract:
Drive-train ground test of large-scale wind turbine is an important means to speed up the R & D process of technology and ensure the performance and reliability of wind power equipment. In recent years, much attention have been paid in wind power developed countries to the construction of wind turbine drive-train ground testing system, but there is no similar public testing system at home. Firstly, the high-power wind turbine drive-train ground testing systems built in the United States, Denmark, Germany and other countries were summarized, and the capability of the testing systems were emphasized. Then, the commonness of these testing systems was analyzed from the aspects of construction, capability and management. Secondly, the corresponding domestic situation was also illustrated, the relevant planning and carried out research layout were introduced. Finally, future of the drive-train ground test of large-scale wind turbine in China was prospected and suggestions of development and construction for the public test system were proposed considering the domestic current and future development requirements of wind power technology and industry.

参考文献/References:

[1]王仲颖,时璟丽,赵勇强,等. 中国风电发展路线图2050[M]. 北京:国家发展与改革委员会能源研究所,2014.
[2]曾承志. 大型双馈风电机组传动系统故障诊断与故障失效预测技术研究[D]. 沈阳:沈阳工业大学,2016.
[3]RYAN F, SCHKODA, CURTISS FOX. Integration of Mechanical and Electrical Hardware for Testing Full Scale Wind Turbine Nacelles[C]//IEEE Conference Publications, 2014 Clemson University Power Systems Conference, 2014:1-8.
[4]SHENG S, LINK H, la CAVA W, et al. Wind Turbine Drivetrain Condition Monitoring During GRC Phase 1 and Phase 2 Testing[ R]. National Renewable Energy Laboratory, NREL/TP-5000-52748, 2011.
[5]Wind Turbine Test Beds: 15 MW Test Rig, 7.5 MW Test Rig[EB/ OL]. [2017-09-10]. http://clemsonenergy.com/wind-turbinetest- beds.
[6]Drive train testing[EB/OL]. [2017-09-10]. https://ore. catapult.org.uk/our-services/test-demonstration-assets/drive-trains.
[7]Test centers and measurements-Nacelle Testing[EB/OL]. [2017-09-10]. https://www.windenergie.iwes.fraunhofer.de/en/ test-centers-and-measurements/drive-train-and-grid-integration.html.
[8]HELMEDAG A, ISERMANN T, MONTI A, et al. Multi-physics power hardware in the loop test bench for on-shore wind turbine nacelles[C]//IEEE Conference Publications, ECCE Asia Downunder, 2013:221-226.
[9]Wind Turbine Test Laboratory (LEA)[EB/OL]. [2017-09-10]. http://www.cener.com/en/areas/wind-energy-department/areas/ wind-turbine-test-laboratory-lea/.
[10]Lind? Nacelle Testing[EB/OL]. [2017-09-10}. http:// www.lorc.dk/test-facilities#lindo-nacelle-testing.
[11]解大,张延迟,张琪,等. 大型风电机组仿真及试验系统——Ⅰ.总述及设计[J]. 实验室研究与探索,2009,28(5):20-23.
XIE D,ZHANG Y C,ZHANG Q,et al. A Large-scale Wind Power Generation Simulation and Testing System I. Introduction and Design[J]. Research and Exploration in Laboratory, 2009, 28(5):20-23.
[12]康涛,蔡安民. 风电机组试验平台技术探讨[J]. 风能,2015 (5):66-69.
[13]国家能源局. 国家能源局关于规范风电设备市场秩序有关要求的通知[EB/OL]. 2014-09-05[2017-09-10]. http://zfxxgk. nea.gov.cn/auto87/201409/t20140925_1841.htm.
[14]国家能源局. 国家能源局关于印发《风电发展“十三五”规划》的通知[EB/OL]. 2016-11-29[2017-09-10]. http://www. nea.gov.cn/2016-11/29/c_135867633.htm.
[15]国家能源局. 国家能源局关于印发《能源技术创新“十三五” 规划》的通知[EB/OL]. 2016-12-30[2017-09-10]. http:// zfxxgk.nea.gov.cn/auto83/201701/t20170113_2490.htm.

相似文献/References:

[1]刘红文,刘春秀,万宇宾,等.基于FAST和Simulink的大型风电机组仿真与性能分析[J].控制与信息技术(原大功率变流技术),2012,(05):34.[doi:10.13889/j.issn.2095-3631.2012.05.012]
 LIU Hong-wen,LIU Chun-xiu,WAN Yu-bin,et al.Simulation and Performance Analysis of Large-scale Wind Turbine Based on FAST and Simulink[J].High Power Converter Technology,2012,(06):34.[doi:10.13889/j.issn.2095-3631.2012.05.012]

备注/Memo

备注/Memo:
收稿日期:2017-10-09
作者简介:胡书举(1978-),男,博士,研究员,研究方向为可再生能源发电控制及测试技术。
基金项目:国家科技支撑计划课题(2015BAA07B02)
更新日期/Last Update: 2017-12-18